These general terms and conditions form an integral part of every estimate, quote, invoice or contract entered into with Isolation à Rabais (hereinafter "the Contractor").
General Terms and Conditions
In case of discrepancy, the French version prevails.
By accepting an estimate or paying a deposit, the client acknowledges having read and accepts these terms.
1. Scope of the work
Only the work specifically described in the estimate is included. Any work not mentioned is an extra and will be invoiced separately.
Soffits are cleared from the attic only. Removing soffits, or any other work needed to reach them, is not included and is billed as extra work.
2. Dimensions and price adjustment
When the dimensions are provided by the client (remote sale), the price is based on the information supplied. The final price will be confirmed on site according to: the exact measurements, the actual accessibility, the structural conditions, the particularities of the building.
Any variation in area, configuration or technical conditions may lead to a price adjustment before the work begins. The Contractor reserves the right to suspend the work if the client refuses the required adjustment.
3. Installation complexity and surface configuration
The stated price assumes standard, continuous and clear surfaces that allow continuous installation. Some configurations do not increase the area, but greatly increase the execution time, sometimes by two to three times. They are subject to a price adjustment.
The following in particular are considered non-standard configurations:
- furring strips, lath, studs or joists forming coffers, cells or closed compartments (coffered ceiling, floor with exposed joists);
- unusual framing spacing, closely spaced members, lining, bridging or multiple bracing;
- cathedral ceiling, sloped surfaces, multiple angles, returns, setbacks and stepped sections;
- beams, ducts, chases, piping, wiring, recessed light fixtures or any other obstacle to work around;
- working height requiring scaffolding, a platform or a lift;
- attic or crawl space with low clearance limiting movement, hose reach or the applicator's position;
- area broken up into several small separate sections rather than one continuous surface;
- extensive masking, protection or cutting required around the surfaces to be treated;
- narrow hatch or access opening, no direct access, or a significant distance between the truck's position and the work area.
When the dimensions and the description of the building are provided remotely by the client (online calculator, photos, telephone), the client must point out these particularities. Failing that, the Contractor notes the actual configuration on arrival and submits the adjustment to the client before starting the work. The client remains free to refuse the adjustment: the work is then cancelled, the travel costs remain billable and the cancellation rules apply.
4. Hidden conditions
Any condition not apparent at the time of the estimate may lead to additional costs, including: mould, excessive moisture, inadequate ventilation, presence of asbestos, infestation, structural damage, concealed obstructions. This work will be subject to an adjustment approved before execution.
5. Building code compliance
Unless otherwise stated in writing, the client is responsible for: any required thermal barrier, any fire-stopping requirement, any interior finishing (e.g. ½" drywall, paint, etc.), any specific municipal requirement. The Contractor is not responsible for regulatory requirements not explicitly included in the estimate.
6. Spray foam
The client acknowledges that: the thickness of the spray foam may vary slightly depending on weather conditions and surfaces; thermal performance depends on several factors beyond the Contractor's control; any required finish or thermal protection remains the client's responsibility unless otherwise indicated.
The execution time and the price assume continuous and accessible surfaces: see "Installation complexity and surface configuration".
7. Ventilation and condensation
The Contractor is not responsible for pre-existing problems of ventilation, condensation, ice formation, prior mould or existing structural defects. The work carried out does not constitute an overall guarantee of the building's ventilation system.
8. Access, parking and work space
The client must provide free and safe access, clear the work areas, and remove or protect their belongings. The Contractor cannot be held responsible for damage to belongings that were not removed or were insufficiently protected. Additional fees may apply in case of obstruction or inadequate preparation.
Parking. Parking is the client's responsibility. Our vehicles are equipment trucks, often with a trailer: the client must reserve and keep clear, from the moment the crew arrives, a parking space at least 45 feet (about 14 metres) long, as close as possible to the work area, with direct access, and free of snow, ice, vehicles and obstacles.
It is up to the client to obtain any permit, authorization or occupancy permit required by their municipality and to have any vehicles blocking the space moved. Any ticket, towing and any fee imposed on the Contractor because of non-compliant parking is billable to the client.
If the required space is not available, if the distance between the vehicle and the work area exceeds the normal reach of our hoses, or if the crew has to wait for a space to free up, additional fees apply and the work may be postponed.
9. Site preparation and work window
Our model relies on fast and efficient execution: the crew arrives, carries out the planned work and leaves. This is what allows us to offer our prices. The crew is not on site to wait, empty a storage space, move furniture, dismantle anything or solve access problems.
The site must be completely ready at the agreed time. Before the crew arrives, the client must have:
- completely emptied and cleared the work area and its access path (attic, roof space, basement, crawl space, garage): storage, furniture, personal belongings, materials;
- made the hatch or access opening free and usable;
- freed the parking space described in the previous article;
- removed or protected any fragile or valuable item located nearby;
- kept animals out of the way and arranged for the occupants to stay out of the work areas during the work;
- arranged for an adult authorized to approve a price adjustment to remain reachable for the entire duration of the work.
For spray foam, the premises must also be free of occupants during the work and during the re-entry period indicated by the Contractor.
Waiting and wasted trip. If the site is not ready when the crew arrives, the Contractor may, at its option: wait and bill the waiting time at $125 per hour, per technician, plus taxes, with any started half-hour being billed; carry out only the portion of the work that is actually accessible; or postpone the work to a later date. A trip during which the work cannot be carried out because of preparation, access or parking is billable (travel and mobilization) and treated as a late cancellation.
These requirements apply to all our work: spray foam, attic or roof space insulation, insulation removal, decontamination, air and vapour barriers, ventilation and service calls.
10. Deposit, payment and financing
A deposit may be required to reserve an installation date. Unless otherwise indicated: the deposit confirms the client's commitment; the balance is payable immediately at the end of the work; financing is subject to credit approval (eligibility must be confirmed); promotional financing offers are for a limited time and Isolation à Rabais has no control over them. Any unpaid amount will bear interest at 2% per month (24% annually).
11. Cancellation
Any cancellation less than 72 hours before the scheduled date may result in the loss of the deposit. If materials have been ordered or costs incurred, these remain billable.
A trip made without the work being able to be carried out, because of the condition of the site, access or parking, is treated as a cancellation less than 72 hours before the scheduled date.
12. Grants
Any information about a grant is provided for guidance only. With the client's authorization, the Contractor prepares and files the grant application in the client's name. Eligibility and the amount are decided by the program: the Contractor does not guarantee the client's eligibility, approval of the file, processing times or the amount granted. For Rénoclimat, where the program calls for an energy assessment before or after the work, it is carried out by a program advisor. Grants are paid directly to the name shown on the applicable government documents.
13. Labour warranty
The warranty covers labour only, as performed by the Contractor. It applies as follows:
- Attic / roof space insulation by blown-in fiberglass: labour warranted for life, according to the terms below. The lifetime warranty applies exclusively to blown-in fiberglass; it does not apply to cellulose insulation.
- All other work (cellulose insulation, spray foam, insulation removal, decontamination, air / vapour barrier, ventilation, etc.): labour warranted for 2 years from the end of the work.
- Materials and products: covered exclusively by their manufacturer's warranty, under the manufacturer's own terms. The Contractor offers no warranty on materials beyond the manufacturer's. For insulation, the product installed is named in the end-of-work report given to the client, along with the manufacturer's warranty when the manufacturer publishes one.
What "for life" means. The "lifetime" warranty covers the useful life of the original installation, as long as it has not been modified, covered, removed or altered. It is attached to the building where the work was carried out and remains valid as long as the signing client remains its owner. In case of sale, it may be transferred only once to the next owner, provided that written notice accompanied by the original, fully paid invoice is sent to the Contractor within 30 days of the sale. After this single transfer, the warranty can no longer be assigned and ends at the next resale. "For life" refers to the duration, not the scope: the warranty remains subject to the exclusions and conditions below.
What is covered. The warranty covers only a defect attributable to the quality of the installation performed by the Contractor, for example insulation that is poorly distributed or an original R-value not reached because of our workmanship. The remedy is limited, at the Contractor's option, to redoing or correcting the defective work. It gives no right to any refund or to indirect damages, and may in no case exceed the amount paid for the work concerned.
What is excluded. The following in particular are excluded from any warranty:
- any damage caused by rodents, insects or animals;
- any water infiltration, roof leak, condensation or moisture problem not directly caused by our installation;
- any work, modification, repair or addition carried out by the client or a third party after our intervention;
- the displacement, settling, covering or removal of the insulation by the client or a third party (renovation, running of wiring, attic storage, traffic in the roof space, etc.);
- pre-existing conditions: inadequate ventilation, structural defects, previous insulation, existing mould or moisture;
- normal wear, natural settling of the insulation within industry tolerances, and performance variation linked to external factors (temperature, building behaviour, heating habits);
- damage caused by a disaster, water damage, fire, natural catastrophe or any force majeure event;
- any heating savings, energy performance or projected R-value presented for guidance: no quantified savings are guaranteed.
Conditions of validity. The warranty is valid only if: the invoice is fully paid (any unpaid balance, payment dispute or chargeback suspends and may cancel the warranty); the original installation has not been modified, covered or altered; and the client gives the Contractor reasonable access to the site as well as a priority right to inspect and correct the work itself before any recourse to a third party. Any repair entrusted to a third party without our prior written authorization voids the warranty on the work concerned.
How to make a claim. Any claim must be sent in writing within 15 days of discovering the defect, including the original invoice and a description of the problem. The Contractor will carry out an inspection within a reasonable time and, where applicable, redo the covered work.
14. Delays and force majeure
The Contractor cannot be held responsible for delays caused by: weather conditions, material shortages, accidents, strikes, events beyond its control. Installation dates are approximate.
15. Limitation of liability
The Contractor's maximum liability is limited to the amount paid for the work concerned. The Contractor cannot be held responsible for indirect losses, loss of income, consequential damages or claims related to pre-existing conditions.
16. Payment disputes
Any payment dispute without prior communication with the Contractor constitutes a breach of contract. Administrative and collection costs may be claimed from the client.
17. Governing law
This contract is governed by the laws of the province of Quebec. Any dispute will be submitted to the judicial district of Quebec.
18. Communications, automated calls and AI agents
By giving us your contact details, you consent to receive calls, text messages and emails from Isolation à Rabais about your request, your quote, your financing, your appointments, the follow-up of your work and our promotions, at the number and address you provided.
These communications may be made by a person or by an automated system, including an artificial-intelligence-generated or prerecorded voice, and an automated telephone dialer. Our telephone agent Sophie is an automated system; if you ask her, she confirms it.
This consent is not a condition of purchase. No product, service or financing is refused to you if you withdraw it. Messaging and data charges may apply depending on your plan, and message frequency varies.
You can withdraw it at any time. Reply STOP to any text message: the stop is immediate and automatic. To stop calls or to be added to our internal do-not-call list, write to info@isolationarabais.com or call us. We honour every withdrawal request, whatever the means used.
We apply Canada's Anti-Spam Legislation, the CRTC telecommunications rules and Quebec's Law 25.
19. Photos of the work
Our installers photograph the attic before and after the work. These photos are used first for the client's file: installation report, warranty and grant application.
The Contractor may also publish some on its websites and in its advertising to show its work, provided that they do not identify either the client or their property. Only the inside of the attic is shown, with no name, address, street number, facade, face, document or personal item, and without the photo's location data.
A client who prefers that the photos of their job be used only for their file may say so at any time at info@isolationarabais.com. The Contractor then removes every photo of that job from its sites and advertising.
Your price in 2 minutes. Free.
Enter your address and see how much you save, with no visit and no commitment.
Lifetime guarantee* · Best price guaranteed · Crew rated 4.9★ from 542 combined Google reviews
